Challenge 1: Steep Site Access
The field is located on a very steep hill with no additional access points, making it difficult to transport materials and equipment. With this limited access, it was crucial to ensure that construction could proceed efficiently despite the challenging terrain.
Challenge 2: Water Management
Another significant hurdle was the natural water flow down the mountain towards the field. The site’s drainage system needed to be carefully planned to handle offsite water runoff and prevent flooding. The goal was to address water management before it reached the field, ensuring the area remained playable and safe.